Manufacturing Plant Line Marking in Malaga WA
Location: 7 Metal Circuit, Malaga
Suburb: Malaga, WA
Facility Type: Manufacturing Plant – Burdens Australia
The Problem (Before)
Burdens Australia contacted us ahead of opening their new manufacturing plant in Malaga. With operations scheduled to begin immediately, the site required clear and compliant pedestrian walkways, fire hydrant markings, and traffic flow lines to meet safety requirements before staff and vehicles could move through the facility.
The key pressure point was timing — all line marking had to be completed before the plant became operational, leaving no room for delays.
The Solution (Our Work)
We delivered a full internal and external line marking solution tailored to the site’s operational needs.
Materials Used:
We applied high-quality water-based line marking paint, finished with a protective clear coating to help resist dirt, grime, and ongoing industrial wear.
Specific Challenges:
The primary challenge was the tight completion deadline. Our team adapted quickly, adjusting workflows and implementing creative scheduling solutions to increase capacity and ensure the project was delivered on time — without compromising quality or safety.
Compliance:
All markings were installed in line with relevant Australian Standards, ensuring the site met workplace safety and operational compliance requirements from day one.
The Result (After)
The project was completed on schedule, allowing Burdens Australia to commence operations on time with all safety and traffic line marking clearly defined.
Key outcomes for the client included:
– Clearly marked pedestrian walkways and vehicle traffic routes
– Fire hydrant locations made highly visible and compliant
– A safer, more professional-looking facility ready for opening day
The finished site supports efficient daily operations while maintaining a strong focus on workplace safety.