Line Marking Project – Manufacturing Facility, Welshpool WA

Location Details

Suburb: Welshpool, Western Australia

Facility Type: Manufacturing Plant

 

The Problem (Before)

The client contacted us following a new warehouse layout at their Welshpool manufacturing facility. With changes to internal traffic flow and pedestrian movement, the existing line marking no longer reflected how the site was being used. Clear guidance was needed to ensure safe interaction between pedestrians, forklifts, and heavy vehicles.

The Solution (Our Work)

We provided a tailored line marking solution designed around the updated warehouse layout and daily operational requirements.

Materials Used:

We applied durable water-based line marking paint, finished with a protective coating to extend lifespan and improve resistance to wear in a high-traffic industrial environment.

Specific Challenges:      

One of the main challenges was coordinating work around stored stock, which limited access to certain areas at different times. Our team worked closely with the client to stage the job efficiently, completing sections as areas became available and avoiding unnecessary disruption to operations.

Compliance:

All line marking was completed in accordance with relevant Australian Standards, ensuring the site met workplace safety and operational compliance requirements.

The Result (After)

The updated line marking delivered immediate improvements in both safety and efficiency across the facility.

 

Key outcomes:

  • Clearly defined pedestrian walkways
  • Designated truck reversing and movement guidelines
  • Improved traffic flow and safer interaction between people and vehicles
  • The site now operates with clearer direction, reduced risk, and a more professional, well-organised appearance.